Force of gravity on boy
F= mg = 40 × 10 = 400N
Total distance covered in 15 steps ,
- = 15 × 15cm = 225cm = 2.25m
Work done by the boy in climbing = Force x distance moved in direction of force
Work, W = F × * = 400 × 2.25 = 900J
Power developed = work done/time takrn = 900J/10s = 90W