+1 vote
in Class 10 by kratos

Mention any four limitations in harnessing wind energy on a large scale.

1 Answer

+2 votes
by kratos
 
Best answer

(i) It can be used only at those places where wind blows for the greater part of the year.

(ii) Wind speed should be higher than 15 km/h to rotate the turbine at the required speed.

(iii) Need of a back up facility when there is no wind.

(iv) Requires large area for setting up wind energy farms.

(v) Tower and blades require a high level of maintenance.

...