Let x be the length of the cloth, its cost = 200
∴ Rate of cloth per meter = 200/x
Increased length of piece of cloth = (x + 5) mts
Now rate of cloth per meter = 200/(21 + 5)
By date, old rate cloth – new rate of cloth = Rs 2.
⇒ x2 + 5x – 500 = 0
⇒ x2 + 25x – 20x – 500 = 0
⇒ x(x + 25) – 20(x + 25) = 0
⇒ x = 20 or -25 (neglected) [∴ x = 20mts]
length of cloth = 20mts, rate per metre = Rs. 10.